Power Plant Labelling Sytem (KKS Numbering Code) Checklist for Civil Procedure. a helpful checklist when running through a civil procedure exam. Mar 8, MEDUPI POWER STATION I Doc No-: KKS01 I Rev: 1 KKS CODING AND LABELLING Doc Type: Procedure Page 2 of 26 Contents 1. Purpose. Procedure for Plant Identification(KKS Numbering System). Uploaded by Tung Hoang Power Plant Labelling Sytem (KKS Numbering Code). Uploaded by.

Author: Zulkilmaran Samurr
Country: Cayman Islands
Language: English (Spanish)
Genre: Travel
Published (Last): 22 January 2012
Pages: 312
PDF File Size: 3.55 Mb
ePub File Size: 18.85 Mb
ISBN: 246-6-11412-881-1
Downloads: 36234
Price: Free* [*Free Regsitration Required]
Uploader: Kazrar

They are generally identified after the system within the interfaces of which the sensor is installed.

A breakdown level tagibg is used to identify the installation space. Room Identification by Coordinates Serial no. G — Electrical devices E — Conventional fuel supply and residues disposal The same applies to structures in civil engineering work.

procedur Structure-related identification is expedient where different systems are held by shared supports. The following principles direct for the designation of installation point in assembly units: Installation Unit Code Serial no.

When technical installations differs only with counting signs of installation it is necessary to assign to a secondary variable counting signs like for one of those installations e. Special Rules for Civil Engineering Feed water system Control and protection system for steam, LY.

  700 HK32Z24 3 4 PDF

Procedure for Plant Identification(KKS Numbering System) – PDF Free Download

The additional code is not an alternative code for the components identified under breakdown level 3. Installation zone X Grid zone Installation zone Y. Plant Commissioning Start Up Procedure[1].

The latter tagingg of data characters occupied by alpha and numeric symbols. Point of Installation Identification Every control loop and every closed-loop control circuit comprises measuring, control and positioning elements regardless faging whether electrical, pneumatic, hydraulic or other items of equipment are used. A standard designation system enables each party, irrespective of language and assignment, to identify uniformly and unambiguously, those parts of the plant within its responsibility.

A2 identifies control and instrumentation functions e. Due to the size of power plants and the fact that the large number of parties participating are all in different locations, communication problems arise which can incur costs which cannot be estimated in advance. The systems and equipments which taaging controlled or monitored by the local control equipment under supervision of the plant DCS shall also equip the KKS number.

Procedure for Plant Identification(KKS Numbering System)

The contents of this designation in KKS, is left for coordination for particular power plant. F Process-related identification In this type of identification the entire system is subdivided according to the function or process, since, whether for mechanical, electrical, control of civil engineering, the equipment units and components must be identifiable in relation to the process.

  FACUNDO CABRAL NO ESTAS DEPRIMIDO ESTAS DISTRAIDO PDF

Coding letters and designations of main groups B1 for components as given in the Component Key kkss for signals and signal applications: On breakdown level 2 supports should be identified by BQ.

QCG Central chemical supply free for use e. Introduction Breakdown level 1 System function Serial no.

Identification System for Power Stations (KKS)

C — Instrumentation and control systems Rules on the Keys This rule does not refer to direct measurement circuits, which apply to technical installation and physical variable. On breakdown level 2, transducer racks, supports and frames are identified by means of GZ.

Inosanto Numbering System Inosanto Kali notes. For example we can identify here: Regulation part is described in level 1 by process-related installation, and level 2 by the controlled parameter – control part is described by executive device e.

Redundant zeros must be written, e.