IFGC 2012 PDF

The International Fuel Gas Code (IFGC ) is a model code produced by the International Code Council (ICC). This document provides the foundation. SECTION (IFGC) GENERAL. Scope. This chapter shall govern the design, installation, modification and maintenance of piping systems. International Fuel Gas Code IFGC/IFGS CHAPTER 8 REFERENCED STANDARDS ยท APPENDIX A (IFGS) SIZING AND CAPACITIES OF GAS PIPING.

Author: Tojakazahn Kajigore
Country: Cyprus
Language: English (Spanish)
Genre: Sex
Published (Last): 18 April 2010
Pages: 158
PDF File Size: 5.17 Mb
ePub File Size: 2.28 Mb
ISBN: 317-9-47956-545-6
Downloads: 24302
Price: Free* [*Free Regsitration Required]
Uploader: Gardale

ICC IFGC (2012): International Fuel and Gas Code

Water heater, automatic storage, gal. Certification and credentialing of individuals involved in the fields of building design, construction and safety. Please enter your e-mail address below. The applicability of this code to piping systems extends from the point of delivery to the connections with the appliance s and includes the design, materials, components, fabrication, assembly, installation, testing, inspection, operation and maintenance of such piping systems.

It is founded on broad-based principles that make possible the use of new materials and new plumbing designs. Piping from multiple meter installations shall be marked with an approved permanent identification by the installer so that the piping system supplied by each meter is readily identifiable.

International Fuel Gas Code 2012 (IFGC 2012)

Initial supply pressure of 8. It provides an international forum for discussion and deliberation about building design, construction methods, safety, performance requirements, technological advances and innovative products.

We will email you a link to reset your password.

Gas 201 Inlet Pressure 5. Reference 2021 related to building design and construction. Gas piping shall jfgc sized in accordance with one of the following:. However, the impact of the codes extends well beyond the regulatory arena, as they are used in a variety of nonregulatory settings. Certification of building jfgc construction-related products. All pipe utilized for the installation, ifvc and alteration of any piping system shall be sized to supply the full number of outlets for the intended purpose and shall be sized in ifggc with Section Clothes dryer, Type 1 domestic.

  LOCHY WATYKANU PDF

If inadequate, the existing system shall be enlarged as required or separate piping of adequate capacity shall be provided. Capacity at 4 gal. Pipe sizing tables or sizing equations in accordance with Section Table capacities are based on Type K copper tubing inside diameter shownwhich has the smallest inside diameter of the copper tubing products. Please change your password. Total load supplied by a single house line regulator not exceeding cubic feet per hour.

There are several that relate specifically to the IFGC. This code is founded on principles intended to establish provisions consistent with the 22012 of a plumbing code that adequately protects public health, safety and welfare; provisions that do not unnecessarily increase construction costs; provisions that do not restrict the use of new materials, products or methods of construction; and provisions that do not give preferential treatment to particular types or classes of materials, products or methods of construction.

When adopting a model code like the IFGC, some jurisdictions amend the code in the process to reflect local practices and laws. Get Involved ICC operates a number of committees and councils related to the development and maintenance of codes and standards. Piping, tubing and fittings shall either be tested by an approved third-party testing agency or certified by an approved third-party certification agency.

In modifying or adding to existing piping systems, sizes shall be maintained in accordance with this chapter.

Other approved engineering methods. In addition to the codes themselves, the code development process brings together building professionals on a regular basis. Where two or more meters are installed on the same premises but supply separate irgc, the piping systems shall not be interconnected on the outlet side of the meters. Capacity at 2 gal. Your account has been marked for password reset.

This edition presents the code as originally issued, with changes reflected in the through editions and with further changes approved by the ICC Code Development Process through Explore all the benefits that ICC Membership has to offer and become a member today to gain access to this exciting content.

Capacity at 6 gal. This chapter shall govern the design, installation, modification and maintenance of piping systems. Each length of pipe and tubing and each pipe fitting, utilized in a fuel gas system, shall bear the identification of the manufacturer. Voluntary compliance programs such as those promoting sustainability, energy efficiency and disaster resistance. Code Development Current Version: The I-Codes, including this International Plumbing Code, are used in a variety of ways in both the public and private sectors.

  DEMOCRATIZING THE CONSTITUTION AUCOIN PDF

Water heater, automatic storage, to gal. A nonprofit, public benefit corporation, ICC-ES does technical evaluations of building products, components, methods, and materials. Utility service piping located within buildings shall be installed in accordance with the structural safety and fire protection provisions of the International Building Code.

The marking shall be spaced at intervals not exceeding 5 feet mm.

ICC IFGC (): International Fuel and Gas Code

Where an input rating is not indicated, the gas supplier, appliance manufacturer or a qualified agency shall be contacted, or the rating ifcg Table Water heater, automatic instantaneous. Most industry professionals are familiar with the I-Codes as the basis of laws and regulations in communities across the U.

Where Equations and are used to size piping or tubing, the pipe or tubing shall have smooth inside walls and the pipe length kfgc be determined in accordance with Section The storage system for liquefied petroleum gas shall be designed and installed in accordance with the International Fire Code and NFPA The total connected hourly load shall be used as the basis for pipe sizing, assuming that all appliances could be operating at full capacity simultaneously.

Less than 2 psi. Benefits of the IFGC: Sign In or Register Here. The insurance industry, to estimate and manage risk, and as a tool in underwriting and rate decisions.