EC&M MAGAZINE PDF

OSHA list of top 10 most cited safety violations for Need expert advice on the National Electrical Code? Try EC&M’s CodeWatch. Electrical Construction Maintenance Contact Us Page.

Author: Maramar Duhn
Country: Libya
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 23 May 2006
Pages: 422
PDF File Size: 2.14 Mb
ePub File Size: 3.17 Mb
ISBN: 399-1-95621-124-8
Downloads: 90169
Price: Free* [*Free Regsitration Required]
Uploader: Mugami

Support service-entrance cable within 1 ft of service heads and raceway connections, and at intervals not exceeding 30 in. You cannot connect equipment to the supply side of the service disconnect enclosure, except for the seven categories identified in We use cookies to support this website, track usage on this website, to perform analytics magaziine to perform promotional activities.

To identify a service conductor, step back and see if mayazine are dealing with a service or a load side distribution point. Download Registration Thanks for registering.

Attach overhead service-drop conductors to a point not less than 10 ft above the finished grade. With the capability to test products together as a system before sending out into the field, TIC ensures the highest level of quality, performance, and reliability.

State of the Industry with EC&M Magazine (Part 1)

But if you start at that point and then follow Article methodically, you will efficiently meet the requirements for a safe service installation. Do you have a question? If we mixed service conductors with other conductors in the same raceway, a fault that occurred between the magazlne and feeder conductors could bypass the overcurrent protection for the feeder conductors. Install the service disconnect at a readily accessible location outside the structure, or inside near the point of entry of the service conductors.

  INDIA UNVEILED BY ROBERT ARNETT PDF

Arrange the service drops and service-entrance conductors to prevent water from entering the service equipment-install the point of attachment below the weatherhead, per Service Equipment You must supply the service disconnect with a main bonding jumper [ Permanently mark each service disconnect to identify it as part of the service disconnecting means [ Please login with your email address.

Select a category, choose a Product Family, then select from the list of available documents.

Article Services – EC&M Magazine

Click here to accept cookies. You cannot use trees as supports How can you correctly and efficiently follow service installation requirements? Service-Drop Conductors The rules for underground service lateral conductors Size your service-entrance conductors per Article Service conductors are “outside” when they are installed: These include meters and tap conductors for certain purposes.

Javascript must be enabled to use this site’s downloads feature. The point of connection between the utility and the premises wiring.

Routing The routing requirements of service conductors differ from those of other conductors. The AS3 is ideal for Industry 4. You must supply the service disconnect with a main bonding jumper [ A pushbutton that activates the electromagnetic coil of a shunt-trip circuit breaker is insufficient see Weatherheads Raceways for overhead service drops If your web browser’s integrated pop-up blocker is enabled, it may prevent the some features on this site from functioning normally.

The results of that error can be expensive-rework or excess cost if you’re lucky, and catastrophic failure if you’re not.

  ASTADASHA SHAKTI PEETHAS PDF

AS3 Adjustable Speed Drive Recognized by EC&M Magazine as Motors & Drives Product of the Year

Check with the AHJ for how far the disconnect can be from the entrance if inside or how far the disconnecting means can be from the structure if outside. Once you’ve established whether service conductors are inside or outside a structure, do you need to install separate raceways for them?

The necessary equipment, usually consisting of circuit breakers or switches and fuses and their accessories, connected to the load end of service conductors to a structure or an otherwise designated areaand intended to constitute the main control and cutoff of the supply. In conduit under not less than 18 in. Otherwise, the NEC applies. Size protection devices magazzine smaller than percent of the continuous load.

Clearance is also an issue-you must observe a 3-ft clearance from building openings and a ft clearance above various surfaces To properly apply magazinw installation requirements for service conductors and equipment, you must first define where your service entrance starts and ends.

Multi-protocol communications channels empower businesses to learn and adjust from data available through connected manufacturing.